Operating Procedures For Shaping Machines

- Sep 15, 2017-

1. 1 Click into the cloth mechanism button into the operation of the interface, click on the upper left-hand corner of the total control switch to red.

1. 2 Click out of the cloth mechanism button to enter the operating interface of the cloth mechanism, the upper left-hand corner of the total control switch to red.

1. 3 Press the Operation panel reset key "Reset", led off, the power-on indicator lights flashing, press the power-on indicator, chain rotation, speed up the flashing indicator lights.

1.4 Click the oven button to enter the heating system: the operation of the setting machine

A. Click on the cycle fan schematic sign to enter the Cycle Fan Power setting window, click the Circulation Fan Total button pop-up cycle fan power setting small window, click on the White bottom digital box pop-up digital keypad, input the required output power value, press confirm.

b. Click on the upper left corner or upper right corner fan schematic to enter the Fan Power setting window, click the Manual control button and confirm, click on the White bottom digital box to eject the numeric keypad input required by the number and confirm. If you click on the Automatic control button and confirm the ventilation opportunity automatically adjust the fan power size.

Click on the oven analog icon to display the temperature of the digital box into the heating window, click the heating total to set the heating temperature, you can also set the heating temperature of each oven separately. Heating temperature at 90 degrees below click a small fire schematic standard for heating, heating temperature at more than 90 degrees, click on the map to heat and confirm.

1. 5 correct cloth route wear into the cloth part of the guide Cloth 9 from the into the cloth rack to the console, along the right cloth route to wear out the cloth part of the guide belt (from the Bushu feed roller to the cloth rack).

1. 6 Operation panel on the Red Stop button, chain operation stopped, the power-on indicator lights flashing. The guide cloth to draw up the chain and press the super feed wheel down pressure button for about 10 seconds, to be pressed button light. Open the parts of the mechanism to the "1" motor. Raise the slurry trough, hit the rolling car pressure, open the position of the console motor (except for the upper needle Protection entrance button), click on the upper left-hand corner of the cloth into the total control button to green.

1. 7 to start the first half of the machine, to guide the cloth after the protection of the entrance needle to open the upper needle protection entrance button to "1", to be guide cloth out of the oven to reach the Bushu feed roller downtime, the guide cloth and the part of the guide belt connected. Click on the Total Control button of the cloth mechanism to green, open out the cloth part of the motor to "1" (except the cooling cylinder tension motor switch) reboot the machine to introduce the guide cloth to the outside of the shelf after the shutdown. Open the cooling cylinder tension motor Switch to "1".

1. 8 Click Pull the Chain control button to enter the chain control interface, according to the process card on the process required to enter the width and indeed

1. 9 according to the process card to find the cloth to be processed into the cloth to be placed on the guide cloth, the good workers and put into the slurry trough (before 20L). According to the organization condition and process of the cloth to be processed, the cloth is rolled or installed. Set the parameters of each part, according to the weft deviation of the cloth to be processed preset weft in the fast/medium slow, left fast/right fast. Ring to inform the incoming cloth ready to boot, to return to the bell press the boot button, speed up the flashing lights, set the speed of the process requirements and confirm, click on the Speed of acceleration button automatically increase to the speed of the process requirements.