Hot air stenter temperature setting and working process

- Sep 19, 2018-

Before the hot air stenter is turned on, the staff should not forget that it should be checked first, so that it can be used normally, and then the temperature needs to be set according to its process requirements. Then, the circulating fan is turned on and the temperature is raised. In the stage, when the speed of the main engine reaches 15m/min and the predetermined temperature is reached, the cloth can be loaded.

When the hot air stenter is on the cloth, it should be noted that the two ends should be as flat as possible. When starting the mainframe of the stenter, the bell should be notified to the tail operator, and then to the rear of the vehicle. When you wear the cloth at the fastest speed and tighten the fabric, the staff at the back should be prepared. Keep in mind that the position of the machine in and out of the cloth should ensure that its safety shield is in good condition to avoid accidents.

The hot air stenter needs to shut down the stentering equipment after the end of the operation. Before the shutdown, the cooling requirements should also be notified to the hot-loaded heat-conducting furnace. Stop the circulating fan first and open the door to cool down. When the temperature drops to 80 °C, it can stop.

In the daily operation process, the staff needs to maintain good working habits, especially to regularly check the heat transfer oil pipeline in the oven. If there is oil leakage, it should be disposed of in time. In addition, the cleaning and care of the stenter should be done and kept in normal working condition.http://www.xindoumachine.com/